Industry reference installation: Central wastewater treatment plant Langenthal (ZALA)

Application - Biology, aeriation and mud system

  • Place - Aarwangen
  • Date of installation - 2003/2004
  • Owener/ Operator - City of Langenthal, Switzerland
  • Engineering - Ing. Büro Holinger, Baden
  • Building Contractor - Meto Bau AG Würenlingen
  • Product - STRAUB-FLEX 2, STRAUB-GRIP-L
  • Diameter Ø - 88.9- 406.4 mm
  • Sealing sleeve - EPDM
  • Casing - 1.4571
  • Lock parts - Stainless steel
  • Working pressure - 0.5-7 bar
  • Test pressure - 5 bar

Brochure (.pdf) >>

Source: Company
Get 3+ quotes so you can compare and choose the supplier that's right for you