Acrow props were used to support the room when a wall was removed, to be replaced by a RSJ Beam. At the same time the floor needed to be propped using Shore 400 Props.
Acrow props were used to support the room when a wall was removed, to be replaced by a RSJ Beam. At the same time the floor needed to be propped using Shore 400 Props.